Tuesday 3 June 2008

Pool Progress

These photos show the reinforcing steelwork being laid ready for the concrete. Notice that the steel mesh is being laid on triangular sections, thus ensuring the steel will be embedded in the middle of the concrete, not just sat on the bottom of it.

The next job will be to fit the sump pipe from the bottom of the pool into the pump house, through the new hole already made.

A video camera is being brought in to examine the large hole that was discovered in the wall when the tiles were removed. We need to know where it is connected to, and what damage may have been done to the walls, if any, by the leakage of water before it is blocked off with concrete.